01.  Welcome
02.  Introduction
03.  Grants
04.  Service
05.  In UNIV-EVRY
06.  Students
  Publications
08.  French Bio-sketch (Français)
09.  Chinese Bio-sketch(中文简介)
 
    2018
      Journal Articles
    • * : PhD students
    • WoS : Web of Science
    • [1] *J. Cheng, F. Chu, MC. Zhou, “An improved model for parallel machine scheduling under time-of-use electricity price”, IEEE Transactions on Automation Science and Engineering (IEEE TASE), 2018. (WoS)
    • [2] F. Zheng, *J. He, F. Chu and M. Liu, “A new distribution-free model for disassembly line balancing problem with stochastic task processing times”, International Journal of Production Research (IJPR), 2018. (WoS)
    • [3] Z. Zhu, F. Chu, A. Dolgui, C. Chu, W. Zhou, and S. Piramuthu, “Recent Advances and Opportunities in Sustainable Food Supply Chain: A Model-oriented Review”, International Journal of Production Research (IJPR), 2018. (WoS)
    • [4] S. Wang, Z. Zhu, K. Fang, F. Chu and C. Chu, “Scheduling on a two-machine permutation flow shop under time-of-use electricity tariffs”, International Journal of Production Research (IJPR), 2018. (WoS)
    • [5] P. Wu, F. Chu, A. Chu and M. Zhou, “Bi-objective scheduling of fire engines for fighting forest fires: new optimization approaches”, IEEE Transactions on Intelligent Transportation Systems (IEEE TITS), 2018. (WoS)
    • [6] F. Zheng, X. Man, F. Chu and M. Lui, “Two Yard Crane Scheduling with Dynamic Processing Time and Interference”, IEEE Transactions on Intelligent Transportation Systems (IEEE TITS), 2018. (WoS)
    2017
      Journal Articles
    • [1] *T. Wu, F. Chu, Z. Yang, Z. Zhen, Z. Zhou and W. Zhou, “Lagrangean relaxation and hybrid simulated annealing tabu search procedure for a two-echelon capacitated facility location problem with plant size selection”, International Journal of Production Research (IJPR), vol. 55, n°9, pp. 2540-2555, 2017. (WoS)
    • [2] *P. Wu, A. Che, F. Chu and Y. Fang, “Exact and heuristic algorithms for rapid and station arrival-time guaranteed bus transportation via lane reservation”, IEEE Transactions on Intelligent Transportation Systems (IEEE TITS), vol. 18, n° 8, pp. 2028-2043, 2017. (WoS)
    • [3] *P. Wu, F. Chu, A. Che and Y. Fang, “An efficient two-phase exact algorithm for the automated truck freight transportation problem", Computers & Industrial Engineering (CIE), vol.110, pp. 59-66, 2017. (WoS)
    • [4] *X. Zhang, F. Chu, X. Yu, Y. Zhou , X. Tian, X. Geng and J. Yang, “Changing Structure and Sustainable Development for China’s Hog Sector”, Sustainability. (WoS)
    • [5] *J. Cheng, F. Chu, M. Liu, P. Wu and W. Xiai, “Bi-criteria single-machine batch scheduling with machine on/off switching under time-of-use tariffs”, Computers & Industrial Engineering (CIE), vol. 112, pp. 721-734, 2017. (WoS)
    • [6] W. Zhou, S. Piramuthu, F. Chu and C. Chu, “RFID-Enabled Flexible Warehousing”, Decision Support Systems, vol. 98, pp. 99-112, 2017. (WoS)
    • [7] Y. Wang, Z. Zhu and F. Chu, “Organic vs. non-organic products: Credence and price competition”, Sustainability, 2017. (WoS)
    • Articles in Conference Proceedings
    • [10] *Y. Li, F. Chu, “Bi-objective optimization of an integrated production inventory routing planning for perishable food", Le Congrès Annuel de la Société Française de Recherche Opérationnelle et Aide à la Décision (ROADEF), 22-24, Février, 2017, Metz, France.
    • [11] *Y. Li, F. Chu, and K. Chen, “Coordinated Production Inventory Routing Planning for Perishable Food”, the 20th World Congress of the International Federation of Automatic Control (IFAC), 9-14 July 2017, Toulouse, France.
    • [12] M. Liu, Z. Sun, X. Zhang and F. Chu, “A two-stage no-wait hybrid flow-shop model for the flight departure scheduling in a multi-airport system”, the14th IEEE International Conference and Control on Networking, Sensing (ICNSC), May 16-18, 2017, Calabria, Italy.
    • [13] M. Liu, *Y. Hou, F. Chu and J. Huo, “Revenue management of airline alliances with integral planning strategy”, the 14th International Conference on Service Systems and Service Management (ICSSSM), June 16--18, 2017, Dalian, China .
    • [14] P. Wu, S. Liu, C. Yang and F. Chu, “A stochastic programming model for optimal bus lane reservation under uncertainty”, european conference on stochastic optimization (ecso) September,20-22, September, 2017, ROMA, Italy.
    • [15] M. Liu, X. Liu, F. Zhen and F. Chu, “Bi-objective optimization of a reentrant flow shop scheduling with exact time lag considering energy cost”, the 7th International Conference on Industrial Engineering and Systems Management (IESM), Saarbrücken, Germany, October 11-13, 2017.
    • [16] M. Liu, *Y. Li, F. Zhen and F. Chu, “Integration of Timetabling, Multi-type Vehicle Scheduling and User Routing in Public Transit Network considering Fuel Consumption”, the 7th International Conference on Industrial Engineering and Systems Management (IESM), Saarbrücken, Germany, October 11-13, 2017.
    • [17] M. Liu, X. Man, F. Chu, F. Zheng and B. DJAFRI, "Bi-objective optimization for a two-depot automated storage/retrieval system in container terminals", 3the International Conference on Multiple Objective Programming and Goal Programming (MOPGP), 30-31, October, 2017, Metz, France.
    • [18] Y. Fang, K. Chen, F. Chu and P. Wu, "Model for the multiple depots heterogeneous dial-aride problem with flexible depots problem with flexible depots", the 14th International Conference on Service Systems and Service Management (ICSSSM), June 16--18, 2017, Dalian, China .
    2016
      Journal Articles
    • [1] *J. Cheng, F. Chu, C. Chu and W. Xiai, Bi-objective optimization of signle-machine batch scheduling under time –of-used electricity prices, RAIRO Operations Research, vol.50, pp. 715-732, 2016. (WoS).
    • [2] S. Wang, M. Lui, F. Chu and C. Chu, Bi-objective Optimization of a single machine batch scheduling problem with energy cost consideration, Journal of Cleaner Production (JCP), vol.137, pp. 1205-1215, 2016. (WoS).
    • [3] J. Zhong, F. Chu, C Chu and S. Yang,Polynomial Dynamic Programming Algorithms for Lot Sizing Models with Bounded Inventory and Stockout and/or Backlogging , Journal of Systems Science and Systems Engineering (JSSSE), 2016, vol.25, n° 3, pp. 370-393. (WoS).
    • [4] Z. Zhu, F. Chu, Y. Yu and L. Sun, Single-machine past-sequence-dependent setup times scheduling with resource allocation and learning effect, RAIRO Operations Research,vol.50, pp. 733-748, 2016. (WoS).
    • [5] M. Lui, S. Wang, C. Chu and F. Chu, An improved exact algorithm for single-machine scheduling to minimize the number of tardy jobs with periodic maintenance, International Journal of Production Research (IJPR), 2016,vol.54, n° 12, pp. 3591-3602. (WoS).
    • [6] M. Lui, S. Wang, F. Chu and Y. Xu, “Some complexity results and an efficient algorithm for quay crane scheduling problem”, Distrete Mathematics, Algorithms and Applications, 2016, vol.8, n°4, 16500582017.(WoS). 2016. Articles in Conference Proceedings
    • [7] *Y. Li, F. Chu, Z. Yang, R. Wolfler Calvo, An Age-based Production Inventory Routing Planning For Perishable Food, the 14th IFAC Symposium on Control in Transportation Systems Systems (CTS 2016), May 18-20, 2016, Istanbul, Turkey.
    • [8] *J. Cheng, F. Chu, M. Liu, and W. Xia, Single-machine batch scheduling under time-of-use tariffs: new mixed-integer programming approaches, the 2016 IEEE International Conference on Systems, Man, and Cybernetics (SMC2016), 9-12 October, 2016, Budapest, Hungary.
    • [9] *Y. Zhang, F. Chu and A. Che, Integrated production inventory routing planning with time windows for perishable food, the 46th International Conference on Computers & Industrial Engineering (CIE46), October 29-31, 2016, Tianjin, China.
    • [10] F. Zheng, X. Man, M.Liu and F. Chu, Yard crane scheduling with reshuffles in an import container block, the 46th International Conference on Computers & Industrial Engineering (CIE46), October 29-31, 2016, Tianjin, China.
    • [11] M. Liu, L. Xu, C. Chu and F. Chu, Framework branch-and-price algorithm for yard management problem at container terminals, the 13th IEEE International Conference on Networking, Sensing and Control (ICNSC´2016), April, 28-30, 2016, Mexico City, Mexico.
    • [12] M. Liu, Y. Song, J. Zhang and F. Chu, Single-machine batch scheduling under time-of-use tariffs: new mixed-integer programming approaches, the IEEE 19th International Conference on Intelligent Transportation Systems (ITSC 2016), November 1-4, 2016, Rio de Janeiro, Brazil.
    • [13] *Y. Li, F. Chu, C. Chu, W. Zhou and Z. Zhu, Integrated production inventory routing planning with time windows for perishable food, the 46th International Conference on Computers & Industrial Engineering (CIE46), October 29-31, 2016, Tianjin, China.
    • [14] F. Zheng, J. Huang, M. Liu and F. Chu, Port truck scheduling on a dedicated transportation route at a container terminal, the 46th International Conference on Computers & Industrial Engineering (CIE46), October 29-31, 2016, Tianjin, China.
    2015
      Journal Articles
    • [1] *C. Feng, F. Chu, J. Ding, G. Bi and L. Liang, Carbon emissions abatement (CEA) allocation and compensation schemes based on DEA, Omega-The International Journal of Management Science, 2015, vol. 53, pp. 78-89. (WoS).
    • [2] *P. Wu, A. Che, F. Chu and M. Zhou, An improved exact e-constraint and cut-and-solve combined method for bi-objective robust lane reservation, IEEE Transactions on Intelligent Transportation Systems (IEEE TITS), vol. 16, n° 3, pp. 1479-1492, 2015. (WoS).
    • [3] *Y. Fang, F. Chu, S. Mammar and Q. Shi, A new cut-and-solve and cutting plane combined approach for the capacitated lane reservation problem, Computers & Industrial Engineering (CIE), 2015, vol. 80, pp. 212-221. (WoS).
    • [4] M. Lui, F. Chu, Z. Zhang and C. Chu, A polynomial-time heuristic for the guay crane double-cycling problem with internal-reshuffling operations, Transportation Research, Part E (TRE), vol. 81, pp. 52-74,2015. (WoS)
    • [5] A. Che, *P. Wu, F. Chu and M. Zhou, Improved Quantum-inspired Evolutionary Algorithm for Large-Size Lane Reservation , IEEE Transactions on Systems, Man and Cybernetics: Systems (IEEE SMCS), vol. 45, n° 12, pp.1535-1548,2015. (WoS).
    • Chapter in books
    • [6] F. Chu, Z. Zhu et S. Mammar, Recent Advances and Issues in Facility Location Problems, Contemporary Issues in Systems Science and Engineering, IEEE/Wiley, Hoboken, NJ,by M. C. Zhou, H-X Li and M. Weijnen, pp. 817-834, 2015.
    • [7] N. Wu, M. Zhou, F. Chu and S. Mammar, Modeling, Analysis, Scheduling, and Control of Cluster Tools in Semiconductor Fabrication, Contemporary Issues in Systems Science and Engineering, IEEE/Wiley, Hoboken, NJ,by M. C. Zhou, H-X Li and M. Weijnen, pp. 289-315, 2015.
    • Articles in Conference Proceedings
    • [8] *P. Wu, F. Chu and A. Che, A mixed integer linear programming approach for closed-loop food supply chain with returnable transport itemsm, the 18th IEEE International Conference on Intelligent Transportation Systems (IEEE ITSC 2015), 15 - 18 September, 2015, Canary Islands, Spain.
    • [9] *J. Cheng, F. Chu, M. Liu and W. Xia, Electricity cost and makespan optimization on a single batch processing machine under time-of-use pricing policy, the 45th International Conference on Computers & Industrial Engineering (CIE45), October 28-30, 2015, Metz, France.
    • [10] *T. Wu, Z. Yang, F. Chu and Z. Zhou, A Lagrangean relaxation approach for a two-stage capacitated facility location problem with choice of facility size , the 2015 IEEE International Conference on Systems, Man, and Cybernetics (SMC2015), October 9-12, 2015, Hong Kong, China.
    • [11] M. Lui, Z. Zhang and F. Chu, A mathematical model for container port integrated scheduling and optimization problem , 2015 IEEE International Conference on Logistics, Informatics and Service Sciences (LISS’2015), 27-29, July, Beijing, China.
    • [12] Y. Fang, F. Chu, Z. Wu and K. Chen, A Tabu Search based algorithm for optimal lane reservation , 12th IEEE International Conference on Networking, Sensing and Control, Taipei, Taiwan, April 9-11, 2015.
    • [13] *T. Wu, Z. Yang, F. Chu and Z. Zhou, A lagrangean relaxation approach for a two-stage capacitated facility location problem with choice of depot size , 12th IEEE International Conference on Networking, Sensing and Control, April 9-11, 2015, Taipei, Taiwan.
    • [14] *J. Cheng, F. Chu et W. Xia, Single machine batch scheduling under time-of-use policy , Congrès Annuel de la Société Française de Recherche Opérationnelle et Aide à la Décision (ROADEF), 26-27 Février 2015, Marseille, France.
    • [15] *P. Wu, A. Che and F. Chu, Optimal lane reservation in urban bus transit network , Congrès Annuel de la Société Française de Recherche Opérationnelle et Aide à la Décision (ROADEF), 26-27 Février 2015, Marseille, France.
    2014
      Journal Articles
    • [1] *Z. Zhou, A. Che, F. Chu and C. Chu, , Model and method for multi-objective time-dependent hazardous material transportation, Mathematical Problems in Engineering (MPE), 2014.(WoS).
    • [2] *Y. Fang, F. Chu, S. Mammar and A. Che, A cut-and-solve based algorithm for optimal lane reservation with dynamic link travel times, International Journal of Production Research, 2014, vol. 52, n°4, pp. 1003--1015.(WoS).
    • [3] *J. Li, F. Chu, C. Prins and Z. Zhu, Lower and upper bounds for a two-stage capacitated facility location problem with handling costs, European Journal of Operational Research (EJOR), 2014, vol. 236, pp. 957–967. (WoS).
    • [4] G. Bi, *C. Feng, J. Ding, L. Liang and F. Chu, The linear formulation of the ZSG-DEA models with different production technologies, Journal of the Operational Research Society, 2014, Vol. 65, n° 8, pp. 1202-1211. (WoS).
    • Articles in Conference Proceedings
    • [5] *J. Cheng, F. Chu, W. Xia, J. Ding et X. Ling, Bi-objective optimization for single-machine batch scheduling considering energy cost, IEEE International Control, Decision and Information Technologies (Codit’14), November, 3-5, 2014, Metz, France.
    • [6] *P. Wu, F. Chu, A. Che et Q. Shi, A bus lane reservation problem in urban bus transit network, IEEE International Conference on Intelligent Transportation Systems (ITSC 2014), October, 8-11, 2014,Qingdao, China.
    • [7] *P. Wu, A. Che et F. Chu, Bi-objective optimization of lane reservation in transportation network, International Conference on Green Supply Chain, 25-27, June 2014, Arras, France.
    2013
      Journal Articles
    • [1] *Y. Fang, F. Chu, S. Mammar et A. Che, An optimal algorithm for automated truck freight transportation via lane reservation strategy, Transportation Research, Part C, 2013, Vol. 26, pp. 170-183. (WoS).
    • [2] C. Chu, F. Chu, J. Zhong et S. Yang, A polynomial algorithm for a lot sizing problem with backlogging, outsourcing models and limited inventory, Computers & Industrial Engineering, Vol. 34, n°4, pp. 529-543, 2013. (WoS).
    • [3] N. Wu, F. Chu, C. Chu et M. Zhou, Petri net modeling and cycle-time analysis of dual-arm cluster tools with wafer revisiting, IEEE Transactions on Systems, Man and Cybernetics: Systems 43(1), pp.196-207, 2013. (WoS).
    • [4] *Z. Zhu, F. Chu, L. Sun, et M. Liu Single machine scheduling with resource allocation and a rate-modifying activity, Applied Mathematical Modeling, Vol. 37, n° 7, pp. 5371-5380, 2013. (WoS).
    • [5] *Z. Yang, Q. Wang and F. Chu, An effective GRASP and Tabu search for the 0-1 quadratic knapsack problem, Computers & Operations Research (COR), vol. 40, n° 5, pp. 1176-1185, 2013. (WoS).
    • [6] *P. Wu,A. Che and F. Chu, Chaos genetic algorithm with variable length chromosome for lane reservation problem, Operations Research and Management Science, (en Chinois), vol.22, n°.1, pp. 15-22, 2013.
    • [7] *Z. Zhou, F. Chu, A. Che and M. Zhou, ε-constraint and fuzzy logic-based optimization of hazardous material transportation via lane reservation, IEEE Transactions on Intelligent Transportation Systems (IEEE TITS), vol. 14, n°2, pp.847-857, 2013. (WoS).
    • [8] N. Wu, M. Zhou, F. Chu et C. Chu, A Petri-net-based scheduling strategy for dual-arm cluster tools with wafer revisiting, IEEE Transactions on Systems, Man and Cybernetics: Systems, vol. 43, n°45, pp.1182-1193, 2013 (WoS).
    • Chapter in books
    • [9] S. Mammar et F. Chu, direction du proceedings de l’ICNSC2013.
    • [10] N. Wu, M. Zhou, F. Chu et S. Mammar, Modeling and Scheduling of Crude Oil Operations in Refinery: A Hybrid Timed Petri Net Approach, Encyclopedia of Embedded Computing Systems, IGI Global, 2013.
    • Articles in Conference Proceedings
    • [11] *Y. Fang, S. Mammar et F. Chu, A new model for lane reservation problem with time-dependent link travel times, 10th IEEE International Conference on Networking, Sensing and Control (ICNSC2013), April 10-12, 2013, Paris, France.
    • [12] *P. Wu, A. Che et F. Chu, A Quantum Evolutionary Algorithm for Lane Reservation Problem, 10th IEEE International Conference on Networking, Sensing and Control (ICNSC2013), April 10-12, 2013, Paris, France.
    • [13] *Z. Zhu, M. Lui, F. Chu et Y. Wu, Single Machine Scheduling with Past-sequence-dependent Delivery Times and Learning Effect, 10th IEEE International Conference on Networking, Sensing and Control (ICNSC2013), April 10-12, 2013, Paris, France.
    2012
      Journal Articles
    • [1] C. Chu, F. Chu, M. Zhou, H. Chen and Q. Shen, A polynomial dynamic programming algorithm for crude oil transportation planning, IEEE Transactions on Automation Science and Engineering (IEEE TASE), Vol. 9, n° 1, pp. 42-5, 2012.(WoS).
    • [2] N. Wu, L. Bai, M. Zhou, F. Chu and S. Mammar, A novel approach to the optimization of refining Schedules for crude oil operations in refinery, IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews (IEEE SMC (C)), Vol. 42, n° 6, pp. 1042-1053, 2012. (WoS).
    • [3] *N. Saidani, F. Chu and H. Chen, Competitive facility location and design with reactions of competitors already in the market, European Journal of Operational Research (EJOR), Vol. 209, n° 1, pp. 9-17, 2012. (WoS).
    • [4] *Y. Huang, F. Chu, C. Chu and Y. Wang, Determining the number of new employees with learning, forgetting and variable wage with a newsvendor model in pull systems, Journal of Intelligent Manufacturing (JIM), Vol. 23, n° 1, pp. 73-89, 2012. (WoS).
    • [5] *Y. Fang, F. Chu, S. Mammar and M. Zhou, Optimal lane reservation in transportation network , IEEE Transactions on Intelligent Transportation Systems (IEEE TITS), Vol. 13, n°2, pp. 482-491, 2012. (WoS).
    • [6] *Z. Yang, F. Chu and H. Chen, A Cut-and-Solve Approach for the Single-Source Capacitated Facility Location Problem Based on Fenchel Cutting Plane, European Journal of Operational Research, Vol. 221, n°3, pp. 521-532, 2012. (WoS).
    • [7] *J. Li, C. Prins and F. Chu, A scatter search for a multi-type transshipment point location problem with multicommodity flow, Journal of Intelligent Manufacturing (JIM), Vol. 23, n° 4, pp. 1103-1117, 2012. (WoS) .
    • [8] *Y. Yu, C. Chu, H. Chen and F. Chu,Large scale stochastic inventory routing problems with split delivery and service level constraints, Annals of Operational Research (AOR), Vol. 197, n° 1, pp. 135-158, 2012. (WoS).
    • Articles in Conference Proceedings
    • [9] *Z. Zhou, F. Chu, A. Che et S. Mammar, A multi-objective model for the hazardous materials transportation problem based on lane reservation, 9th IEEE International Conference on Networking, Sensing and Control (ICNSC2012), April 11-14, 2012, Beijing, China.
    • [10] J. Li, C. Ren, J. Dong, B. Shao et F. Chu, A solution for reallocating public bike among bike stations, 9th IEEE International Conference on Networking, Sensing and Control (ICNSC2012), April 11-14, 2012, Beijing, China.
    • [11] *Y. Fang, F. Chu, S. Mammar et A. Che, Lane reservation problem with time-dependent travel times, 14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM 2012), May 23-25, 2012, Bucharest, Romania.
    • [12] *N. Saidani, F. Chu et H. Chen, PSO algorithm for the location and design of multiple facilities in a competitive environmen, International Workshop on Green Supply Chain (GSC’ 2012), Arras, France, June 21 - 22, 2012.
    2011
      Journal Articles
    • [1] *J. Li, F. Chu and H. Chen, Coordination of split deliveries in one-warehouse multi-retailer distribution systems, Computers & Industrial Engineering, (C&IE), Vol. 60, n°2, pp. 291-301, 2011. (WoS).
    • [2] *J. Li, F. Chu and H. Chen, A solution to the inventory routing problem in a three-level distribution system, European Journal of Operational Research (EJOR), Vol. 210, n°3, pp.736-744, 2011. (WoS).
    • [3] N. Wu, C. Chu, F. Chu and M. Zhou, Schedulability Analysis of Short-Term Scheduling for Crude Oil Operations in Refinery with Oil Residency Time and Charging-Tank-Switch-Overlap Constraints, IEEE Transactions on Automation Science and Engineering (IEEE TASE), Vol. 8, n°1, pp. 190-204, 2011. (WoS).
    • [4] *Q. Shen, F. Chu and H. Chen,A lagrangian relaxation approach for an inventory routing problem in crude oil transportation, Computers & Chemical Engineering (CCE), vol. 35, n° 10, pp. 2113-2123, 2011. (SCI).
    • [5] N. Wu, F. Chu, S. Mammar and M. Zhou, Petri net modeling of cooperation behavior of driver and co-pilot in advanced driving assistance systems, IEEE Transactions on Intelligent Transportation Systems (IEEE TITS), vol. 12, n°4, 977-989, 2011.(WoS).
    • [6] *Z. Zhu, L. Sun, F. Chu and M. Liu Single-machine group scheduling with resource allocation and learning effect, Computers & Industrial Engineering, (C&IE), Vol. 60, n° 1, pp. 148-157, 2011. (WoS).
    • [7] N. Wu, F. Chu, C. Chu and M. Zhou, Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes, IEEE Transactions Automation Science and Engineering (IEEE TASE), vol. 8, n° 1, 42-55,2011. (WoS).
    • [8] *Z. Yang, H. Chen and F. Chu, A lagrangian relaxation approach for a large scale new variant of capacitated clustering problem, Computers & Industrial Engineering (C&IE), vol.61, n° 2, pp. 430-435, 2011. (WoS).
    • [9] *Z. Zhu, L. Sun, F. Chu and M. Liu Due-window assignment and scheduling with multiple rate modifying activities under the effects of deterioration and learning, Mathematical Problems in Engineering (MPE), doi:10.1155/2011/151563, 2011. (WoS).
    • Articles in Conference Proceedings
    • [10] *N. Saidani, F. Chu and H. Chen, Exact and approached algorithms for incorporation of the reactions of the competitors in the location of multi-new facilities in the plane, 9e Congrès International de Génie Industriel, 12-14, octobre 2011, Québec, Canada, 12-14, octobre 2011.
    • [11] N. Wu, F. Chu, C. Chu et M. Zhou, Petri Net-Based Cycle Time Analysis of Dual-Arm Cluster Tools With Wafer Revisiting under Swapping Strategy, 2011 IEEE International Conference on Robotics an d Automation, May 9-13, 2011, Shanghai, China.
    • [12] *N. Saidani, H. Chen and F. Chu, Incorporating competitors' reactions in discrete competitive facility location and design problem, International Conference on Industrial Engineering and Systems Management (IESM), May 25 - May 27, 2011, Metz, France.
    • [13] *Y. Fang, S. Mammar, F. Chu and Ada Che, The capacitated lane reservation problem in transportation network, The First International Conference on Mobility, Security and Logistics in Transport (MSLT 2011), May 31- June 03, 2011, Hammamet, Tunisia.
    • [14] *Z. Zhu, F. Chu, L. Sun and M. Liu, Scheduling with resource allocation and past-sequence-dependent setup times including deteriorating maintenance, 2011 IEEE International Conference on Networking, Sensing and Control (ICNSC2011), April 11-13, 2011 Delft, the Netherlands.
    • [15] *Y. Fang, F. Chu, S. Mammar, A. Che, Iterative Algorithm for Lane Reservation Problem on Transportation Network, 2011 IEEE International Conference on Networking, Sensing and Control (ICNSC2011), April 11-13, 2011 Delft, the Netherlands.
    • [16] N. Wu, F. Chu, S. Mammar and M. Zhou, Interaction Behavior Modeling of Advanced Driving Assistance Systems by Using Petri Net, 2011 IEEE International Conference on Networking, Sensing and Control (ICNSC2011), April 11-13, 2011 Delft, the Netherlands.
    • [17] *N. Saidani, H. Chen and F. Chu, Une nouvelle méthode à deux étapes pour la résolution d’un problème de localisation dans un environnement Concurrentiel, 12ième Congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Ste Etienne, 2-4 Mars 2011.
    2010
      Journal Articles
    • [1] *Z. Zhu, F. Chu, and L. Sun, The capacitated plant location problem with customers and suppliers matching, Transportation Research, Part E (TRE), 2010, Vol. 46, n° 3, pp. 469-480. (WoS).
    • [2] N. Wu, F. Chu, C. Chu, and M. Zhou, Hybrid Petri net modeling and schedulability analysis of high fusion point oil transportation under tank grouping strategy for crude oil operations in refinery, IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews (IEEE SMC (C)), 2010, Vol. 40, n° 2, pp.159-175. (WoS).
    • [3] N. Wu, F. Chu, C. Chu, and M. Zhou, Tank cycling and scheduling analysis of high fusion point oil transportation for crude oil operations in refinery, Computers & Chemical Engineering (CCE), 2010, Vol. 34, pp. 529-543. (WoS).
    • [4] F. Chu, C. Chu and *C. Desprez, Series production in a basic re-entrant shop to minimize makespan or total flow time, Computers & Industrial Engineering (C&IE), 2010, Vol. 58, n° 2, pp. 257-268. (WoS).
    • [5] *J. Li, Chen, H. and Chu, F. Performance evaluation of distribution strategies for the inventory routing problem, European Journal of Operational Research (EJOR), 2010, Vol. 202; n° 2, pp. 412-419. (WoS).
    • Articles in Conference Proceedings
    • [6] *Z. Zhu, L. Sun and F. Chu, Location problem with selective matching and vehicles assignment, The International Conference on Management Science and Information Engineering (ICMSIE), December, 17-19, 2010, Henan, China.
    • [7] *N. Saidani, F. Chu, and H. Chen, A new method for the location and design of multiple new facilities in competitive market, 24rd European Conference on Operational Research (EURO2009), July 11-14, 2010, Lisbon Portugal.
    • [8] *Q. Shen, F. Chu and H. Chen, An Effective Lagrangian Relaxation Approach for Multiple-Mode Crude Oil Transportation Optimization, IEEE International Conference on Mechatronics and Automation , August 4-7, 2010, Xi’an, China.
    • [9] *Y. Fang, S. Mammar and F. Chu, Capacity Lane Reservation Problem on Transportation Network, 12ième Congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Ste Etienne, 2-4 Mars 2011.
    • [10] *N. Saidani, F. Chu, and H. Chen, Une nouvelle méthode à deux étapes pour la résolution d’un problème de localisation dans un environnement Concurrentiel, 11ième Congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2010), Toulouse, 24-26 févier 2010.
    Publications before 2010
      Journal Articles
    • [1] *J. Li, F. Chu and C. Prins, Lower and upper bounds for a capacitated plant location problem with multicommodity flow, Computers & Operations Research, 2009, Vol. 36, n° 11, pp. 3019-3030 (WoS).
    • [2] *C. Desprez, F. Chu and C. Chu, Minimizing the (weighted) number of tardy jobs in a hybrid flow shop with a genetic algorithm, International Journal of Computer Integrated Manufacturing, 2009, Vol. 22, N° 8, pp.745-757. (WoS).
    • [3] N. Wu, F. Chu, C. Chu, and M. Zhou, Short-term schedulability analysis of multiple distiller crude oil operations in refinery with oil residency time constraint, IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews (IEEE SMC (C)), 2009, Vol. 39, n° 1, pp. 1-16. (WoS).
    • [4] *Q. Shen, H. Chen, F. Chu and M. Zhou, Multi-mode transportation planning of crude oil via greedy randomized adaptive search procedure and path-relinking, Transactions of the Institute of Measurement and Control, 2009, Vol. 31, pp.1-20. (WoS).
    • [5] *Y. Yu, F. Chu and H. Chen, Stackelberg game and its improvement in a VMI system with a manufacturing vendor, European Journal of Operational Research (EJOR), 2009, Vol. 192, n° 3, pp. 929-948. (WoS).
    • [6] N. Wu, M. Zhou and F. Chu, A Petri net based heuristic algorithm for realizability of target refining scheduling for oil refinery, IEEE Transactions on Automation Science and Engineering (IEEE TASE), 2008, Vol. 5, n° 4, pp 661-676. (WoS).
    • [7] N. Wu, F. Chu, C Chu and M. Zhou, Short-term schedulability analysis of crude oil operations in refiney with residency time constraint using Petri nets, IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews (IEEE SMC (C)), 2008, Vol. 38, n° 6, pp765-778, November. (WoS).
    • [8] N. Wu, C, Chu, F. Chu and M. Zhou, A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints IEEE Transaction on Semiconductor Manufacturing, 2008, Vol. 21, n°2, pp1-14. (WoS).
    • [9] F. Chu and C. Chu, «Single-Item Dynamic Lot-Sizing Models with Bounded Inventory and Out-Sourcing», IEEE Transactions on Systems, Man and Cybernetics Part A: Systems and Humans (IEEE SMC (A)), 2008, Vol. 38, n°1, pp.1-8. (WoS).
    • [10] *Y. Yu, H. Chen and F. Chu, A new model and hybrid approach for large scale inventory routing problem, European Journal of Operational Research (EJOR), 2008, Vol. 189, Issue 3, n°16, pp.1022-1040. (WoS).
    • [11] *Q. Shen, H. Chen and F. Chu, Model and algorithm for an inventory routing problem in crude oil transportation, Journal of advanced manufacturing systems (JAMS), 2008, Vol. 7, n° 2, pp297-301.
    • [12] F. Chu, Lot Sizing Models with Bounded Inventory and Stockout: Polynomial Dynamic Programming Algorithms, Journal of Operations and Logistics (JOL), 2007, Vol.1, n°2, pp. III.1-III.13.
    • [13] F. Chu and C. Chu, Polynomial algorithms for single item lot sizing models with bounded inventory and backlogging or outsourcing, IEEE Transactions on Automation Science and Engineering (IEEE TASE), 2007. Vol. 4, n° 2, pp. 233-251. (WoS).
    • [14] *Y. Yu, F. Chu and H. Chen, A note on coordination of production and distribution planning, European Journal of Operational Research (EJOR), 2007, Vol. 1, n° 1, pp. 626-629. (SCI).
    • [15] X. Liu, F. Chu, C. Chu and C. Wang, Lot sizing with bounded inventory and lost sales, International Journal of Production Research (IJPR), December 2007, Vol. 45, Issue 24, pp. 5881-5894. (SCI).
    • [16] X. Luo and F. Chu, A branch and bound algorithm of the single machine scheduling with sequence-dependent setup times for minimizing total tardiness, Applied Mathematics and Computation (AMC), 2006, Vol. 183, n°1, pp. 575-588. (WoS).
    • [17] *Y. Yu, H. Chen and F. Chu, Large scale inventory routing problem with split delivery: A new model and Lagrangian relaxation approach, International Journal of Services Operations and Informatics (IJSOI), 2006, Vol. 1, n° 1, pp. 304-320.
    • [18] *Y. Yu, F. Chu, and H. Chen, On improving an integrated inventory model for a single vendor and multiple buyers with ordering cost reduction, Journal of Systems Science and Systems Engineering (JSSSE), 2006, Vol. 15, n° 3, pp. 298-313.
    • [19] F. Chu, *N. Labadi and C. Prins, A scatter search for the periodic capacitated arc routing problem, European Journal of Operational Research (EJOR), March 2006, Vol. 169, n°2, pp. 586-605. (WoS).
    • [20] N. Wu, M. Zhou and F. Chu, Short-term scheduling for refinery process: Bridging the gap between theory and applications, International Journal of Intelligent Control and Systems (IJICS), June 2005, Vol. 11, n°2, pp. 162-174.
    • [21] F. Chu, *N. Labadi and C. Prins, Heuristics for the periodic capacitated arc routing problem, Journal of Intelligent Manufacturing (JIM), Vol. 16, n°2, December 2005, pp. 243-251. (WoS).
    • [22] H. Chen, L. Amodeo, F. Chu, and K. Labadi, Modeling and performance evaluation of supply chains using batch deterministic and stochastic Petri nets, IEEE Transactions on Automation Science and Engineering (TASE), Vol. 2, n°2, April 2005, pp. 132-144. (WoS).
    • [23] F. Chu, *N. Labadi and C. Prins, The periodic capacitated arc routing problem: Linear programming model, metaheuristic and lower bounds, Journal of Systems Science and Systems Engineering (JSSSE), Vol. 13, n° 4, 2004, pp. 423-435.
    • [24] X. Liu, F. Chu, C Chu and C. Wang, Some new properties for capacitated lot sizing problem with bounded inventory and stockouts, WSEAS TRANSACTIONS, Vol. 3, January, 2004, pp. 65-70.
    • [25] A. Che, C. Chu and F. Chu, «Multicyclic hoist scheduling with constant processing times», IEEE Transactions on Robotics and Automation (TRA), Vol. 18, n°1, 2002, pp. 69-80. (SCI).
    • [26] F. Chu and X.L. Xie, «Deadlock analysis of Petri nets using siphons and mathematical programming», IEEE Transactions on Robotics and Automation (TRA), Vol. 13, n°6, 1997, pp. 793 804. (SCI).
    • [27] F. Chu, J.M. Proth and F. Vernadat, «Planning and scheduling of discrete manufacturing systems: A Petri net based framework», Zeszyty Naukowe, Akademii Gorniczo-Hutniczej Im. S. Staszica, AutomatyKa z. 64, N°1546, 1993, pp. 277-295.
    • [28] C. Chu, F. Chu, J.M. Proth and X.L. Xie. «Vérification incrémentale de la consistance d'un réseau de Petri», Technique et Science Informatiques (TSI), vol. 14, n° 7, 1995, pp. 867-896.
    • Chapter in books
    • [29] F. Chu, J.M. Proth et V.M. Savi, "Planning and scheduling based on Petri nets", Advances in Manufacturing Systems: Design, Modeling and Analysis, in series Manufacturing Research and Technology, Ed. R.S. Sodhi, Assistant ed. M. Zhou and S. Das, Elesevier Scientific Publishers: Amsterdam, The Netherlands, 1994, pp. 49-56.
    • Articles in Conference Proceedings
    • [30] *J. LI, F. Chu and C. Prins, Lower and Upper Bounds for a Capacitated transhipment point location problem with handling costs, INFORMS Annual Meeting, Oct 11-14, 2009, San Diego, USA.
    • [31] *Z. Yang, F. Chu, and H. Chen, Tight lower bound for the single-source capacitated facility location problem based on Fenchel cutting planes, The 8rd International Conference on Information and Management Science (IMS2009), July 20-28, 2009, Kunming, China.
    • [32] *J. Li, F.Chu and H. Chen, An improved model for large scale inventory routing problem with useful properties,Control and Decision Conference, 2009. CCDC '09, China, pp2949-2953.
    • [33] *Q. Shen, F. Chu and H. Chen, A Lagrangian Relaxation Approach for an Inventory Routing Problem in Crude Oil Transportation, The 3rd International Conference of Operations and Supply Chain Management (3rd ICOSCM), July 28 – August 5, 2009, Wuhan, China.
    • [34] J. Wu, C. Chu, F. Chu and N. Wu, «Heuristic for Lane Reservation Problem in Time Constrainted Transportation», 2009 IEEE Conference on Automation Science and Engineering, August 22-25, 2009, Bangalore, India.
    • [35] N. Wu, F. Chu, C. Chu and M. Zhou, «A Novel Approach to Scheduling of Single-Arm Cluster Tool with Wafer revisiting», 2009 IEEE Conference on Automation Science and Engineering, August 22-25, 2009, Bangalore, India.
    • [36] *J. Li, F. Chu and C. Prins, Scatter search for a multi-type transshipment point location problem with multi-commodity flow, 2009 CORS/INFORMS International, June 14- 17, 2009, Toronto, Canada.
    • [37] *Z. Yang, F. Chu, and H. Chen, A lower bound and upper bound for the capacitated location-routing problem, 23rd European Conference on Operational Research (EURO2009), July 5-8, 2009, Bonn, Germany.
    • [38] *N. Saidani, F. Chu, and H. Chen, Competitive facility location and design model with reaction of competitors for profit maximization in the plane, 23rd European Conference on Operational Research (EURO2009), July 5-8, 2009, Bonn, Germany
    • [39] *Z. Zhu, F. Chu, and L. Sun, The plant location problem based the linkages of customers and suppliers,, Fourth International Workshop on Freight Transportation and Logistics (ODYSSEUS2009), May 26-29, 2009, Cesme, Turkey.
    • [40] *J. Li, F. Chu and C. Prins, A lagrangran-based meta-heuristic for a capacitated plant location problem with multicommodity flow, Fourth International Workshop on Freight Transportation and Logistics (ODYSSEUS2009), May 26-29, 2009, Cesme, Turkey.
    • [41] F. Chu, C. Chu, Q. Shen and H. Chen, An O(T3) Polynomial algorithm for crude oil transportation, 4th Annual IEEE Conference on Automation Science and Engineering (CASE 2008), August 23-26, 2008, Key Bridge Marriott, Washington DC, USA, pp. 303-308.
    • [42] N. Wu, M.C. Zhou, S. Peng, F. Chu, and C. Chu, Petri net modeling and real-time control of dual-arm cluster tools with residency time constraint and activity time variations, 4th Annual IEEE Conference on Automation Science and Engineering (CASE 2008), August 23-26, 2008, Key Bridge Marriott, Washington DC, USA, pp. 109-114.
    • [43] *Y. Huang, F. Chu, C. Chu and Y. Wang, Determining the size of new employees with learning effect and variable wage in Newsvendor Model, Human and Organisational Factors in Planning and Scheduling Conference (HOPS 08), 8-9 September 2008, EPFL, Lausanne, Switzerland.
    • [44] *J. Li, F. Chu and H. Chen, Model and algorithm for the vendor-warehouse transportation and inventory problem in a three-level distribution system, 17th IFAC World Congress, July, 6-11, 2008, South Korea, pp. 13097-13102.
    • [45] *J. Li, H. Chen and F. Chu, Effectiveness evaluation on direct shipping strategy, IEEE International Conference on Systems, Man and Cybernetics (IEEE SMC08), 12-15, October, Singapore, pp. 1760-1764.
    • [46] N. Wu, C. Chu, F. Chu and M. Zhou, Short-term schedulability analysis of crude oil operations in refinery with hybrid Petri net, IEEE International Conference on Systems, Man and Cybernetics (IEEE SMC08), 12-15, October, Singapore, pp 1916-1921.
    • [47] *Z. Yang, H. Chen and F. Chu, A new variant of generalized assignment problem with consideration of balance of average assignment cost, 7th Conférence Internationale de Modélisation et Simulation (MOSIM’08), 31, March -3, April, 2008, Paris, France, 6p.
    • [48] N. Wu, C. Chu, F. Chu and M. Zhou, Modeling and schedulability analysis of single-arm cluster tools with wafer residency time constraints using Petri net, in Proceedings of 2008 IEEE International Conference on Networking, Sensing and Control, April, 6-8, 2008, Hainan, China, pp. 84-89.
    • [49] *J. Li, F. Chu and Chen, H. Probabilistic analysis on three-level distribution systems, IEEE International Conference on Systems, Man and Cybernetics (IEEE SMC07), October, 7-10, 2007, Montréal, Canada, pp. 1729-1734.
    • [50] N. Wu, F. Chu, C. Chu, and M. Zhou, “ Schedulability analysis of short-term schedule for crude oil operations using Petri net IEEE International Conference on Systems, Man and Cybernetics (IEEE SMC07), October, 7-10, 2007, Montréal, Canada, pp.3481-3486.
    • [51] *Q. Shen, H. Chen and F. Chu, Model and algorithm for an inventory routing problem in crude oil transportation, International Conference on Product Design and Manufacturing Systems (PDMS07), October, 12-15, 2007, Chongqing, China, 3p.
    • [52] F. Chu, C. Chu and C. Desprez, Makespan and total flow time minimization in a basic re-entrant shop for series production, International Conference on Industrial Engineering and Systems Management (IESM 2007), May 30 - June 2, 2007, Beijing, China, 6p.
    • [53] *Z. Yang, F. Chu and H. Chen, A lagrangian relaxation approach for the capacitated vehicle routing problem, 4th international Conference on Cybernetics and Information Technologies, Systems and applications (CITSA 2007), 12-15 July 2007. Orlando, USA, Vol.3, pp.116-121.
    • [54] *Z. Yang, H. Chen and F. Chu, Facility location problem with minimum capacity constraints, International Conference on Industrial Engineering and Systems Management (IESM 2007), May 30 - June 2, 2007, Beijing, China, 6p.
    • [55] *J. Zhong, F. Chu, C. Chu and S. Yang, Mixed backlogging and outsourcing models with inventory capacity, IEEE International Conference on Systems, Man and Cybernetics (IEEE SMC06), October, 8-11, 2006, Taipei, Taiwan, Chine, pp. 290-295.
    • [56] N. Wu, Y. Qian M. C. Zhou and F. Chu, Issues on short-term scheduling of oil refinery, IEEE International Conference on Systems, Man and Cybernetics (IEEE SMC06), Taipei, Octobre 8-11, 2006, pp. 2920-2925.
    • [57] *C. Desprez, C. Chu and F. Chu, A genetic algorithm for minimizing the weighted number of tardy jobs, International Conference on Service Systems and Service Management (ICSSSM06), Troyes, France, October 25-27, 2006, pp. 1271-1276.
    • [58] *J. Zhong, C. Chu, F. Chu and S. Yang, Mixed backlogging and stockout models with inventory capacity, International Conference on Service Systems and Service Management (ICSSSM06), Troyes, France, October 25-27, 2006, pp. 290-295.
    • [59] *Y. Yu, F. Chu and H. Chen, A model and algorithm for large scale stochastic inventory routing problem, International Conference on Service Systems and Service Management (ICSSSM06), Troyes, France, October 25-27, 2006, pp. 355-360.
    • [60] *C. Desprez, F. Chu and C. Chu, Minimisation du nombre pondéré de tâches en retard dans le cas d’une production en série, 7ième Congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2006), Lille, France, 6-8 février 2006, 2 pages.
    • [61] N. Wu, Y. Qian and F. Chu, Realizability of target refining schedule for oil refinery, IEEE International Conference on Systems, Man and Cybernetics (IEEE SMC05), Waikoloa, Hawaii, October 10-12, 2005, pp. 2031-2036.
    • [62] *Y. Yu, H. Chen, F. Chu and C. Chu, Large scale inventory routing problem with split delivery: New model and Lagrangian relaxation approach, IEEE International Conference on Service Operations and Logistics, and Information (IEEE SOLI), Beijing, China, 10-12, August, 2005, pp.431-436.
    • [63] F. Chu and C. Chu, Dynamic lot sizing models with bounded inventory and backlogging, International Conference on Service Systems and Service Management (ICSSSM05), Chongqing, China, 13-15 June, 2005, pp. 318-322.
    • [64] F. Chu, C. Chu and X. Liu, Lot sizing models with backlog or outsourcing, International Conference on Systems, Man and Cybernetics, The Hague, The Netherlands (IEEE SMC04), October 10-13 2004, pp. 4342 4347.
    • [65] F. Chu and C. Chu, Single item dynamic lot sizing models with sale loss, International Conference On Service Systems and Service Management (ICSSSM04), Beijing, China, 19-21, July, 2004, pp. 120-125.
    • [66] F. Chu and C. Chu, Polynomially solvable single item dynamic lot sizing models with lost sales, 3th International Conference on Optimization and Control with Applications (OCA), Chongqing, Chine, 25-31, July, 2004, pp.42.
    • [67] X. Liu, C. Wang, F. Chu and C. Chu, A forward algorithm for capacitated lot sizing Problem with lost sales, 5th World Congress on Intelligent Control and Automation, Hangzhou, Chine, 15-19 June, 2004, pp. 3192 3196.
    • [68] F. Chu, *N. Labadi and C. Prins, The periodic capacitated arc routing problem: Linear programming model, metaheuristic and lower bounds, International Conference on Service Systems and Service Management (ICSSSM04), Beijing, China, 19-21 July, 2004, pp.784-789.
    • [69] F. Chu, *N. Labadi and C. Prins, A scatter search for the periodic capacitated arc routing problem, Project Management and Scheduling (PMS), Nancy, France, 26-28 Avril, 2004, pp. 415-420.
    • [70] F. Chu, *N. Labadi and C. Prins, Lower bounds for the periodic capacitated arc routing problem, 2nd International Workshop on Freight Transportation and Logistics, (ODYSSEUS’03), Palerme, Greece, May, 2003, pp. 27-30.
    • [71] F. Chu, *N. Labadi and C. Prins, Les problèmes de tournées sur arcs périodiques, 5ième Congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2003), Avignon, France, 26-28 février 2003, pp. 237-238.
    • [72] F. Chu, N. Labadi and C. Prins, Periodic arc routing problems: Linear programming model and heuristics, 9th International Multi-Conference on Advanced Computer Systems (ACS’02), Miedzyzdroje, Pologne, 23-25 October 2002, pp. 409-418.
    • [73] Haoxun Chen, L. Amodeo and F. Chu, Batch deterministic and stochastic Petri Nets: A tool for modeling and performance evaluation of supply chain, IEEE International Conference on Robotics and Automation, Washington, USA, May 11-15, 2002, vol. 1, pp. 78-83.
    • [74] Haoxun Chen, L. Amodeo and F. Chu, Modeling and performance evaluation of supply chain with batch deterministic and stochastic Petri Nets, 13th Annual European Simulation Symposium, Marseille, France, October 18-20, 2001, pp. 415-419.
    • [75] A. Che, F. CHU and C. CHU, «Un algorithme d’ordonnancement multi-cyclique d’un robot », 3th Conférence Francophone de Modélisation et Simulation en Conception, Analyse et Gestion des Systèmes Industriels (MOSIM’01), Troyes, France, Avril 25-27, 2001, pp. 385-390.
    • [76] F. Chu and S. Zhao, «Planning and scheduling of multi-cell manufacturing systems based on Petri nets», International Conference on Industrial Engineering and Production Management, Glasgow, UK, July 12-15, 1999. pp. 457-468.
    • [77] F. Chu and X.L. Xie, «Siphon and trap generation in an incremental design process based on Petri nets», IEEE Conference on Emerging Technologies and Factory Automation, Paris, 10-13 octobre, 1995, vol. 1, pp. 333-342.
    • [78] F. Chu, J.M. Proth and V.M. Savi, «Planning and scheduling based on Petri nets», 8th CARS and FOF Conference, August 18-20, 1993, Newark, New Jersey, USA. Aussi dans Advances in Manufacturing Systems: Design, Modeling and Analysis, in series Manufacturing Research and Technology, Ed. R.S. Sodhi, Assistant ed. M. Zhou and S. Das, Elesevier Scientific Publishers: Amsterdam, The Netherlands, 1994, pp. 49-56.
    • INRIA Technical Reports
    • [79] F. Chu and J.M. Proth. Conception des systèmes à événements discrets à l'aide des réseaux de Petri – la propriété de bornitude structurelle, n° 2245, Avril 1994.
    • [80] C. Chu, F. Chu, J.M. Proth and X.L. Xie. Conception des systèmes à événements discrets à l'aide des réseaux de Petri – la propriété de consistance, n° 2186, Février 1994.
    • [81] C. Chu, F. Chu, and J.M. Proth. Vérification de la consistance et de la conservation d'un réseau de Petri, n° 2070, Octobre 1993.
    • [82] F. Chu, J.M. Proth and V.M. Savi. Ordonnancement basé sur les réseaux de Petri, n° 1960, juillet 1993.
Feng Chu (c) 2016